Case study
Airbus Defence & Space,
Mars Rover facilities
Stevenage
The brief
We were instructed on what can only be described as a once in a lifetime opportunity, as lead project managers on the construction of the test and bio clean room facilities for the build of a space terrain vehicle.
What we did
In the first of two major facilities projects, the vehicle test facility was constructed within part of an existing single storey portal frame building, to an area measuring roughly 30m by 13m and containing around 300 tonnes of kiln dried sand.
The clean room facility, a class 100,000 (ISO 8) bio clean room, was designed by us at planning stage.
The outcome
We managed the clean room facility from inception through the tender and construction stages to completion, witnessing commissioning, snagging and de-snagging and final handover at practical completion.
Image credit: Airbus