Case study
New Forest Print Finishing,
Black Moor Road
Verwood
The brief
New Forest Print Finishing Ltd instructed us to prepare a detailed Schedule of Condition for two industrial units in Verwood, supporting their lease agreement and protecting their dilapidations position at lease expiry.
The instruction called for the condition of the units to be recorded precisely before the lease commenced, giving clarity to both landlord and tenant and reducing the risk of a future dispute. With a very tight turnaround, accuracy and efficiency were critical to safeguarding the client's interests and supporting fair lease negotiations.
What we did
The on-site inspection was undertaken by Lauren Robbins and Sophia Heighway, who carried out a thorough internal and external survey to capture the existing condition in full detail. To strengthen the report, we used drone technology to obtain aerial imagery, giving clear visual records of roof coverings and external elements that are often difficult to inspect safely and efficiently.
The outcome
Despite the timescales, we delivered a comprehensive Schedule of Condition within three days of inspection, a record turnaround for us. The final document provided high-quality photographic and written evidence, giving the client confidence and long-term protection against unnecessary dilapidations claims.
Experienced surveyors, modern technology and clear communication are what let BAS deliver reliable building consultancy across Southampton, Hampshire and the South Coast, with practical, cost-effective advice tailored to real commercial pressures.
Related services
Looking for more case studies?
Our ProjectsLet's talk
Got a project like this one?
Tell us what you're working on and we'll take it from there.
Trusted by