The managing agent appointed us to deliver a full project management service for two blocks of flats on Belle Vue Road in Poole, after a previous condition survey highlighted significant balcony deterioration. Once the leaseholders were ready to proceed, we took the project from inception through to completion.
The initial objective was to restore the failing balconies and bring them into line with all relevant safety standards. As the works progressed, though, additional structural issues came to light, and these needed swift investigation and remedial measures to prevent further deterioration and hold the programme together.
What we did
Our building surveyor, Sophia Heighway, managed every stage of the process, from preparing a detailed specification of works and submitting the planning application through to running the tender process and overseeing delivery on site. The project was delivered collaboratively with Westmade Ltd as appointed contractors, with our Head of Health and Safety, Andy Strugnell, providing support and Godsell Arnold Partnership Limited offering structural engineering expertise.
When the unforeseen structural issues emerged, we worked closely with the engineers to fold the additional remedial works in alongside the planned repairs. That meant the balconies were not only restored, but the buildings were strengthened for long-term durability.
The outcome
Balconies were successfully restored across both blocks, structural integrity was improved beyond the original scope, and delivery stayed smooth throughout on the back of strong collaboration and a commitment to safety.
Comprehensive project management, close coordination between surveyors, contractors and engineers, and proactive communication are what keep stakeholders informed and confident from start to finish.